Skip to main content
Cart

Design Evolution in PIR: Understanding the Improved Bond‑Splitting Model in AS 5216.2026

Learn what new improvements the new code AS5216:2026 brings in respect to achieving post-installed rebar connections anchorage for concrete-to-concrete connections using APP D.

AS 5216:2026 is now officially published — and it brings major changes to how we design and certify post‑installed rebar connections. The new Appendix D provisions, rooted in EOTA TR 069, introduce an improved bond‑splitting model and close long‑standing gaps in PIR design. This webinar breaks down what’s changed, why it matters, and the practical impacts for design and compliance under the 2026 revision. Join us on 28 May 2026 at 1:00 PM AEDT to learn how AS 5216:2026 reshapes post‑installed fixings and what it means for your future projects.


 Sessions

Sorry, no results found.

Presentation material
Design Evolution in PIR: Understanding the Improved Bond‑Splitting Model in AS 5216:2026
Download