We have a building that wont permit PVC at all , not even the riser fthrough the slab.
we have to install 2 x floor wastes open ended flush at floor level above and maintain metallic pipework throughout.
is there a solution for copper, stainless steel or cast iron finished flush with the slab on the top side?