I am infilling the existing openings in a double brick party wall between two shops. We are required to achieve a 90 FRL
The gap or control joint between the existing brickwork and the infill brickwork will be 10mm. I am proposing to use a 15mm dia PE rod with a 20mm depth of CP606 Flexible Firestop sealant to each side of the 270 wide wall (110 b/w, 50 cavity, 110 b/w). page 11 of 25 detail (b) of Warringtonfire report shows the fire side with the firestop sealant installed on the opposite face. I will have a fire source on both sides of the wall with the fire source facing the firestop sealant. Am I still compliant as my fire source is on the opposite side to that shown in ringtonfire report?
Hi Peter,
Thank you for posting your question in Ask Hilti.
Considering the amount of detail shared and the question being related to a specific project, could you please send your request with further information to our technical team? Please visit click here to request further assistance.
Best regards,
Ask Hilti Team
Australia